48 hr countdown for PSLV-C31/IRNSS-1E mission begins

Sarkar

Contributor
Joined
1 Jun 2013
Messages
9,957
Reaction score
6,366
The 48 hour countdown for the launch of the fifth navigational satellite IRNSS-1E by ISRO’s workhorse launch vehicle PSLV-C31, on January 20 began at 0931 hrs at the spaceport of Sriharikota, today.
ISRO sources said ”the 48hr countdown activity of PSLV-C31/IRNSS-1E Mission
started at 0931 hrs today”.

The launch scheduled to take place from the Second Launch Pad at 0931 hrs on Wednesday.

During the countdown, propellant filling operations would be taken up in the four stage vehicle.

https://twitter.com/isro?ref_src=twsrc%5Egoogle%7Ctwcamp%5Eserp%7Ctwgr%5Eauthor


Update : Mixed Oxides of Nitrogen (MON-3) oxidiser filling operation of PS4 is completed by 18:15 hr IST.
 
Back
Top Bottom
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock