Communication satellite with Ku bands slated for launch

  • Thread starter Thread starter Thakur
  • Start date Start date
  • Replies Replies: Replies 1
  • Views Views: Views 978

Thakur

Banned
Joined
30 Aug 2013
Messages
14,856
Reaction score
8,575
The GSAT-11 spacecraft, a first generation high throughput communication satellite, is to be launched towards the end of 2016 or the first quarter of 2017, Space minister Jitendra Singh told parliament today.

GSAT-11 has a lift-off mass of about 5600 kg, operating in Ka/Ku bands. It is a multi-beam satellite with 32 user beams and 8 hub beams over India. The spacecraft capability includes providing broadband connectivity to rural areas with higher bandwidth as compared to traditional communication satellites. 

It is planned to launch GSAT-11 spacecraft using procured launch services. At present, the indigenous capability to launch this weight class of satellite is not available. The in-orbit testing of GSAT-11 satellite is planned to be conducted from the Master Control Facility (MCF) in Hassan, Karnataka and other suitable locations of ISRO Centres. 




http://www.indiantelevision.com/satellites/satelite-operators/communication-satellite-with-ku-bands-slated-for-launch-160427
 
No more transponder shortage as it will add 200+ transponder in Insat system. Now Only need SCE 200 to be operational [emoji106]
 
Back
Top Bottom