AsitPaul
Contributor
- Joined
- 7 Oct 2011
- Messages
- 2,658
- Reaction score
- 723
Now a days, Tripura facing serious power crunch. Now daily requirement is 98MW more than available power. So we face 12 to 18 hr Load Shedding. There is no rule when power comes and goes off. Water Supply, Hospitals, Nursing Home, School, Colleges and Officer has bad impact. Even ATMs are not working. People have attacked Local Office Of Electricity very often. This is a curse.
Before election, to ensure 24hr power supply govt has already devastated the whole power system. Most awaited 729MW Palatana Natural Gas Plant will be operational till they year end. Till then, we have no other way than bear 12 to 18 hr power crisis.
Want to p*** power minister.
Before election, to ensure 24hr power supply govt has already devastated the whole power system. Most awaited 729MW Palatana Natural Gas Plant will be operational till they year end. Till then, we have no other way than bear 12 to 18 hr power crisis.
Want to p*** power minister.