Vikram
Member
- Joined
- 3 Nov 2010
- Messages
- 4,969
- Reaction score
- 3,690
.
*High and low signal strength sensitivity ranges
*Streamlined menu system
*Use of the meter while charging
*Switchmode power supply
*Adjustable power off time
*LNB function test from the meter
*Super fast dataset selection
*USB data transfer interface
*High and low signal strength sensitivity ranges
*Streamlined menu system
*Use of the meter while charging
*Switchmode power supply
*Adjustable power off time
*LNB function test from the meter
*Super fast dataset selection
*USB data transfer interface