abhinaba Contributor Joined 23 Jul 2015 Messages 400 Reaction score 116 8 Sep 2016 #21 RE: GSLV-F05 / INSAT-3DR launch on 8th Sept 2016 at 04:50 pm Heat-shield separated
abhinaba Contributor Joined 23 Jul 2015 Messages 400 Reaction score 116 8 Sep 2016 #22 RE: GSLV-F05 / INSAT-3DR launch on 8th Sept 2016 at 04:50 pm CE-7.5 ignited
abhinaba Contributor Joined 23 Jul 2015 Messages 400 Reaction score 116 8 Sep 2016 #23 RE: GSLV-F05 / INSAT-3DR launch on 8th Sept 2016 at 04:50 pm Relative velocity 6 km/sec achieved
abhinaba Contributor Joined 23 Jul 2015 Messages 400 Reaction score 116 8 Sep 2016 #24 RE: GSLV-F05 / INSAT-3DR launch on 8th Sept 2016 at 04:50 pm Relative velocity 9 km/sec achieved
abhinaba Contributor Joined 23 Jul 2015 Messages 400 Reaction score 116 8 Sep 2016 #25 RE: GSLV-F05 / INSAT-3DR launch on 8th Sept 2016 at 04:50 pm CUS burnout completed
abhinaba Contributor Joined 23 Jul 2015 Messages 400 Reaction score 116 8 Sep 2016 #26 RE: GSLV-F05 / INSAT-3DR launch on 8th Sept 2016 at 04:50 pm INSAT-3DR injected
S Sarkar Contributor Joined 1 Jun 2013 Messages 9,957 Reaction score 6,366 8 Sep 2016 #27 Now we need bigger cryogenic engine CE 20 for MKIII
abhinaba Contributor Joined 23 Jul 2015 Messages 400 Reaction score 116 8 Sep 2016 #28 Perigee within 300 m, apogee 80 km, 0 for inclination, 0.1 degree for argument of perigee - LPSC Director. Virtually no anomalies.
Perigee within 300 m, apogee 80 km, 0 for inclination, 0.1 degree for argument of perigee - LPSC Director. Virtually no anomalies.
abhinaba Contributor Joined 23 Jul 2015 Messages 400 Reaction score 116 8 Sep 2016 #29 ISAC Director - "Insat 3DR has solar arrays deployed and 3 axis stablised. Scatsat launching in 2-3 weeks on 4 October"
ISAC Director - "Insat 3DR has solar arrays deployed and 3 axis stablised. Scatsat launching in 2-3 weeks on 4 October"
abhinaba Contributor Joined 23 Jul 2015 Messages 400 Reaction score 116 8 Sep 2016 #30 Amature video from The Hindu